DaimlerChrysler Crossdock Terminal

Toledo, Ohio


DaimlerChrysler hired Mosser to design and build this 100,000 sf pre-engineered CECO building to be used as a cross-dock terminal servicing their production facility.

  • Extensive site development was accomplished in adverse weather conditions
  • Fast-track schedule allowed this project to be completed in 180 days