DaimlerChrysler Crossdock Terminal
Toledo, Ohio
DaimlerChrysler hired Mosser to design and build this 100,000 sf pre-engineered CECO building to be used as a cross-dock terminal servicing their production facility.
- Extensive site development was accomplished in adverse weather conditions
- Fast-track schedule allowed this project to be completed in 180 days