Toledo Clinic: Pain Management / Neurology Remodel

Toledo, Ohio


The renovations to the Neurology and Pain Management suites at the Toledo Clinic impacted two adjacent spaces consisting of approximately 4,500 sf.  The Neurology Suite scope of work involved complete renovation while the Pain Management side was slightly smaller in scope. All areas received new walls to isolate the space, new paint/wallpaper, flooring, acoustical ceilings, solid core wood doors and casework.  Thin brick veneer was added to one office and the waiting area to give them aesthetics of bringing the outdoors inside.  

Phase two was dedicated to making the space more functional for the Pain Management practice. Working second shifts, Mosser completed the renovation, all while the entire suite was occupied.  The majority of the work consisted of expanding the nurses’ station and adding a new C-Arm Room. The nurse’s station essentially doubled in size creating more space for the growing staff. The C-Arm Room was a completely new area that will house a specialized piece of X-ray equipment, requiring the application of lead-lined drywall. The majority of the suite received new finishes from flooring to wall coverings to paint.  A few new doors were added or relocated and new casework was installed in specific areas.

“Mosser Construction has completed several major interior remodeling jobs for Toledo Clinic over the last year and we have been very impressed with their quality of work as well as their ability to respond to questions and the timeliness of project completion."

 Mary Ellen Tanner, Director of Operations at Toledo Clinic, Inc.